Stove Installation
Posted in General
Forenoon watch, 6 bells (11:10 am)

The installed showed up late this morning, but things were moving by the time I left to come in to work. I finished grouting the box this morning before 7am, so it had at least a couple of hours to dry before anything happened to it. It does look pretty nice, although it will be almost entirely covered up by the stove when it's installed.

Now all I have left to do is the front curvy piece and the tiles on the sides of the box and I'll be done. At least I don't have a deadline to get that part done.

Leave a Comment »